Templates  

Pugh Matrix (CTQs)  

Pugh Matrix (CTQs)

en
  1. 2
    CTQs
    FR - Functional Requirements: Structure of functions and technical requirements (critical to quality, CTQ).
  2. 3
    Importance
    Importance: Importance score for each function / ctq. Usually coming from other modules, e.g. AHP.
  3. 4
    Pugh Matrix
    Pugh Table: Enter a score for each requirement and concept. Use the drop-down-list or a keyboard shortcut to select a score (-- [Shift]+[2], - [Shift]+[1], o [0], + [1], ++ [2]). For technical requirements it is also possible to enter real measurements. This requires the range table in technical benchmarking being filled out.
  4. 6
    Specifications
    Specifications: Enter details for each requirement here. Use the details slider in the status bar to display more or less details.
  5. 7
    Chart
    The diagram shows importance values and variances for all criteria as bars. The scores for each concept are shown as line graphs. Data is re-scaled to a 10 point scale.
  6. 8
    Concept Scoring
    Result: Shows calculated results from the pugh table, e.g. weighted score, sum of + / -, etc.
  7. 9
    Results
    Results Chart: Shows the total score of each concept as a bar. The "whiskers" display a confidence interval.
  8. 10
    Guide
  9. 11
    Variant (optional)
    Choose one of the defined variants
  10. 12
    Concept
    Choose the winning concept. All further project steps will refer to this concept.

More Worksheets